An Act To Implement the Recommendations of the Governor's Ocean Energy Task Force
Emergency preamble. Whereas, acts and resolves of the Legislature do not become effective until 90 days after adjournment unless enacted as emergencies; and
Whereas, in 2008, crude oil prices reached $147 per barrel, and gasoline and heating oil prices reached over $4 per gallon, highlighting our State's long over-reliance on oil for home-heating and fuel for our vehicles and on natural gas and other fossil fuels to produce electricity; and
Whereas, along with the foreseeable prospect of prolonged high or higher fossil fuel prices, the implications of climate change, driven by greenhouse gas emissions from combustion of fossil fuels, and its attendant threats to the environment, economy, social fabric and human health underscore the urgent need to significantly reduce and minimize our State's dependence on oil and gas; and
Whereas, renewable ocean energy holds enormous promise to address our state and regional energy goals, including energy independence and security and limiting exposure to fossil fuels' price and supply volatility; to ensure attainment of our greenhouse gas emissions reduction goals; and to provide significant economic opportunities for our citizens; and
Whereas, state and adjoining federal waters feature significant offshore wind, tidal and wave power energy resources, including world-class and untapped deep-water wind resources with the potential to meet the full range of the State's energy needs, such as lighting and power for appliances, heat for our homes and fuel for our cars, with the potential to make the State a net energy exporter; and
Whereas, the Governor's Ocean Energy Task Force identified and made recommendations to overcome economic, technical and regulatory obstacles and to provide economic incentives for vigorous and efficient development of these promising indigenous, renewable ocean energy resources in ways that recognize the concurrent need to sustain the ongoing biological integrity, vitality and productivity and related existing uses of those natural resources and to ensure provision of benefits to the people of the State for use of public resources for renewable ocean energy production; and
Whereas, although additional research and related technological advances are needed for efficient commercialization of deep water offshore wind power, varied and significant potential public benefits attributable to development and transition over time to optimal use of this resource and the State's other renewable ocean energy resources necessitates action now to position the State to capture these benefits for the people of the State; and
Whereas, in the judgment of the Legislature, these facts create an emergency within the meaning of the Constitution of Maine and require the following legislation as immediately necessary for the preservation of the public peace, health and safety; now, therefore,
PART A
Sec. A-1. 35-A MRSA §3132, sub-§1-B, as enacted by PL 2007, c. 148, §2, is amended to read:
Sec. A-2. 35-A MRSA §3132, sub-§6, as amended by PL 2009, c. 309, §3, is further amended to read:
Sec. A-3. 35-A MRSA §3402, sub-§1, as enacted by PL 2007, c. 661, Pt. A, §4, is amended to read:
Sec. A-4. 35-A MRSA §3402, sub-§3 is enacted to read:
Sec. A-5. 35-A MRSA §3404, sub-§1, as enacted by PL 2007, c. 661, Pt. A, §6, is amended to read:
Sec. A-6. 35-A MRSA §3404, sub-§2, as enacted by PL 2007, c. 661, Pt. A, §6, is amended to read:
Sec. A-7. 38 MRSA §631, sub-§3 is enacted to read:
Sec. A-8. Heating conversion program. No later than January 15, 2011, the Department of Environmental Protection, in consultation with the Public Utilities Commission, the Finance Authority of Maine and the Efficiency Maine Trust, if adequate funding is received, shall develop a program that provides incentives for home and business owners in the State to convert their fossil fuel-powered home or business heating systems to more efficient, less polluting electric-powered systems. In developing the program, the department shall consider pertinent analyses and recommendations in the final report of the Ocean Energy Task Force created pursuant to Executive Order 20 FY08/09, including but not limited to those in Appendix 3 of that report. The program developed pursuant to this section must include the following:
1. Definitions of the types of electric-powered home heating systems that qualify for support under the program;
2. Clarification that only a home or business location that meets a specified electricity use efficiency standard developed in accordance with the Executive Department, Governor's Office of Energy Independence and Security is eligible for financial support through the program;
3. A formula for provision of financial support that reflects the total cost of installation of qualified electric-powered heating systems, the size of internal areas of the home or business location to be heated with such a system and other pertinent factors;
4. Assurance that a homeowner or business owner has the opportunity to realize savings in heating costs through participation in the program;
5. A mechanism that allows a homeowner or business owner that participates in the program to avoid or defer costs related to system installation by financing such costs through an added charge on the homeowner's or business owner's monthly bill for electric utility services; and
6. As an added incentive for participation in the program, a cap on the rate of increase or price of electricity charged to a participating homeowner or business owner over a 20-year term or other contract term that the department considers appropriate.
No later than January 15, 2011 and prior to implementation of the program, the Department of Environmental Protection shall report to the joint standing committee of the Legislature having jurisdiction over utilities and energy matters on the program developed pursuant to this section and shall include in this report recommended legislation, if any, necessary or appropriate for its implementation. The joint standing committee of the Legislature having jurisdiction over utilities and energy matters may report out a bill to address the department's recommendation pursuant to this section.
Sec. A-9. Moral obligation credit enhancement program. No later than January 15, 2011, the Finance Authority of Maine, in consultation with the Department of Environmental Protection, the Public Utilities Commission and the Efficiency Maine Trust, shall develop a moral obligation credit enhancement program modeled on the electric rate stabilization projects program established by Public Law 1993, chapter 712 to use the State’s credit rating to reduce financing costs of electric ratepayer-backed renewable ocean energy projects, as defined by the Maine Revised Statutes, Title 12, section 1862, subsection 1, paragraph F-1, and projects for conversion to electric heating qualified for support under the heating conversion program developed by the Department of Environmental Protection pursuant to this Act. The purpose of the program developed pursuant to this section is to provide state financial assistance to qualified projects that do not pose a significant risk of financial loss to the State and that will support the goals of assisting in the development of commercial-scale renewable ocean energy projects or the conversion of energy demand away from the use of oil or gas as a primary energy source. No later than January 15, 2011 and prior to initiation of the program, the Finance Authority of Maine shall report to the joint standing committees of the Legislature having jurisdiction over utilities and energy matters and business, research and economic development matters on the program developed pursuant to this section and shall include in this report recommended legislation, if any, necessary or appropriate for its implementation. The joint standing committees of the Legislature having jurisdiction over utilities and energy matters and business, research and economic development matters may report out a bill to address the authority's recommendation pursuant to this section.
Sec. A-10. Competitive solicitation; renewable ocean energy projects; long-term contract. Following development and consideration of the recommendation required under this section and, except as otherwise provided by this section, in accordance with the Maine Revised Statutes, Title 35-A, section 3210-C, the Public Utilities Commission shall conduct a competitive solicitation for proposals for offshore wind, tidal and wave energy produced by one or more renewable ocean energy projects, as defined by Title 12, section 1862, subsection 1, paragraph F-1, employing generating facilities located in the State's coastal waters or adjoining federal waters. Following review of bids, the commission may negotiate with one or more potential suppliers. The commission may direct one or more transmission and distribution utilities, as appropriate, to enter into a long-term contract of up to 20 years for the energy, capacity and renewable energy credits of one or more of the renewable ocean energy projects if the commission determines that:
1. The bidder has the technical and financial capacity to develop, construct and operate the project that would produce the energy to be acquired; and
2. Acquisition of the energy, capacity and renewable energy credits at the price and other terms proposed would not have an unreasonable impact on the electricity rates of the transmission and distribution utility.
No later than March 15, 2011, the Executive Department, Office of Energy Independence and Security shall make a recommendation to the joint standing committee of the Legislature having jurisdiction over utilities and energy matters regarding determination of the impact on electricity rates for purposes of subsection 2. In making this recommendation, the office shall consider the following: risks to ratepayers associated with fossil fuel price volatility over the next 20 years; state goals regarding greenhouse gas emissions reductions established in Title 38, section 576; state wind energy generation goals under Title 35-A, section 3404, subsection 2; estimated energy and cost savings attributable to state programs that support weatherization and conversion of homes to more efficient heat sources: and other potential benefits attributable to the development of offshore wind, tidal and wave energy, including but not limited to public health, job creation and other economic benefits and energy security. The joint standing committee of the Legislature having jurisdiction over utilities and energy matters may report out a bill to address the office's recommendation pursuant to this section.
Sec. A-11. State energy plan amendment. No later than September 15, 2010, the Executive Department, Governor's Office of Energy Independence and Security shall amend the state energy plan under Title 2, section 9 to acknowledge the need for new transmission capacity to support attainment of state offshore wind energy generation goals established in the Maine Revised Statutes, Title 35-A, section 3404, subsection 2.
Sec. A-12. Assess the need for port-side land acquisition. No later than January 15, 2011, the Maine Port Authority shall assess existing port facilities in the State and make a recommendation to the joint standing committees of the Legislature having jurisdiction over transportation matters and utilities and energy matters regarding acquisition of real estate needed to facilitate renewable ocean energy development opportunities.
PART B
Sec. B-1. 12 MRSA §1862, as amended by PL 2009, c. 270, Pt. B, §1 and c. 316, §§1 to 6 and affected by §7, is further amended to read:
§ 1862. Submerged and intertidal lands owned by State
(1) An offshore wind power project, as defined by Title 38, section 480-B, subsection 6-A or by Title 38, section 482, subsection 8, and with an aggregate generating capacity of 3 megawatts or more;
(2) A community-based offshore wind energy project, as defined by section 682, subsection 19;
(3) A hydropower project, as defined by Title 38, section 632, subsection 3, that uses tidal or wave action as a source of electrical or mechanical power; or
(4) Other development activity that produces electric or mechanical power solely through use of wind, waves, tides, currents, ocean temperature clines, marine biomass or other renewable sources in, on or over the State's coastal waters, as defined by section 6001, subsection 6, to the 3-mile limit of state ownership recognized under the federal Outer Continental Shelf Lands Act, 43 United States Code, Chapter 29, Subchapter III (2009), and that includes both "generating facilities," as defined by Title 35-A, section 3451, subsection 5 and "associated facilities," as defined by Title 35-A, section 3451, subsection 1.
(1) The Except as otherwise provided by subsection 13, the director shall charge the lessee a rent that practically approximates the fair market rental value of the submerged land. The reduction factors and base rate for use categories are as follows:
(a) A reduction factor of 0% with no base rate or rental fee for nonprofit organizations or publicly owned facilities that offer free public use or public use with nominal user fees. Public uses include, but are not limited to, municipal utilities and facilities that provide public access to the water, town wharves, walkways, fishing piers, boat launches, parks, nature reserves, swimming or skating areas and other projects designed to allow or enhance public recreation, fishing, fowling and navigation and for which user fees are used exclusively for the maintenance of the facility;
(b) A reduction factor of 0.1% plus a base rate of $0.025 per square foot for commercial fishing uses of renewable aquatic resources. Commercial uses of renewable aquatic resources include, but are not limited to, facilities that are directly involved in commercial fishing activities. Such facilities include, but are not limited to, fish piers, lobster impoundments, fish processing facilities and floats or piers for the storage of gear;
(c) A reduction factor of 2% for any slip space rented or otherwise made available for private use by commercial fishing boats for a fee;
(d) A reduction factor of 0.2% plus a base rate of $0.05 per square foot for water-dependent commerce, industry and private uses. Water-dependent commerce, industry and private uses other than commercial uses of renewable aquatic resources include, but are not limited to, all facilities that are functionally dependent upon a waterfront location, can not reasonably be located or operated on an upland site or are essential to the operation of the marine industry. Such facilities include, but are not limited to, privately owned piers and docks, cargo ports, private boat ramps, shipping and ferry terminals, tug and barge facilities, businesses that are engaged in watercraft construction, maintenance or repair, aquariums and the area within marinas occupied by service facilities, gas docks, breakwaters and other structures not used for slip space;
(e) A reduction factor of 4% for any slip space rented or otherwise made available for private use for recreational boats for a fee; and
(f) A reduction factor of 0.2% for upland uses and fill located on submerged lands prior to July 1, 2009 and 0.4% for new upland uses and fill after July 1, 2009 plus a base rate of $0.05 per square foot. Upland uses include, but are not limited to, all uses that can operate in a location other than on the waterfront or that are not essential to the operation of the marine industry. These facilities include, but are not limited to, residences, offices, restaurants and parking lots. Fill must include the placement of solid material other than pilings or other open support structures upon submerged lands.
If the director determines that the municipally assessed value of the adjacent upland is not an accurate indicator of the value of submerged land, the director may make adjustments in the municipally assessed value so that it more closely reflects the value of comparable waterfront properties in the vicinity or require the applicant to provide an appraisal of the submerged land. The appraisal must be approved by the director.
For offshore projects where municipally assessed value for the adjacent upland or submerged lands appraisals are unavailable or the director determines that such assessment or appraisals do not accurately indicate the value of the submerged land, the director may establish the submerged lands annual rental rate and other public compensation as appropriate by negotiation between the bureau and the applicant. In such cases the annual rent and other public compensation must take into account the proposed use of the submerged lands, the extent to which traditional and customary public uses may be diminished, the public benefit of the project, the economic value of the project and the avoided cost to the applicant. If the State's ability to determine the values listed in this paragraph or to carry out negotiations requires expertise beyond the program's capability, the applicant must pay for the costs of contracting for such expertise;
(2) After October 1, 1990, the director may revalue all existing rents to full fair market rental value. Rents for all uses except slip space may be adjusted annually as needed over a period not to exceed 5 years until the full fair market rental value is reached. After the full fair market rental value is reached, the director may revalue rents for all uses except slip space every 5 years based on changes in municipally assessed value and programmatic cost adjustments to the base rate. Adjustments to the base rate may not exceed 4% per year. Rents for slip space may fluctuate annually depending on the gross income of the facility;
(3) The Except as otherwise provided by subsection 13, the director may also lease a buffer zone of not more than 30 feet in width around a permanent structure located on submerged or intertidal land, provided that as long as the lease is necessary to preserve the integrity and safety of the structure and that the Commissioner of Marine Resources consents to that lease;
(4) Any existing or proposed lease may be subleased for the period of the original lease for the purpose of providing berthing space for any boat or vessel;
(5) No portion of an existing or proposed lease may be transferred from a person subleasing that portion to provide berthing space for any boat or vessel except for a transfer to heirs upon death of the sublessee holder or a transfer to the original leaseholder subject to terms agreed to by the lessor and sublessee at the time of the sublease. This subparagraph does not apply to any subleasing arrangements entered into before June 15, 1989; and
(6) The director may grant the proposed lease if the director finds that, in addition to any other findings that the director may require, the proposed lease:
(a) Will not unreasonably interfere with navigation;
(b) Will not unreasonably interfere with fishing or other existing marine uses of the area;
(c) Will not unreasonably diminish the availability of services and facilities necessary for commercial marine activities; and
(d) Will not unreasonably interfere with ingress and egress of riparian owners.
The bureau shall adopt rules pertaining to this subparagraph by March 15, 1990.
In making findings pursuant to this subsection regarding a renewable ocean energy project, the director shall adopt all pertinent findings and conclusions in a permit issued for the project pursuant to chapter 206-A or pursuant to Title 38, chapter 3, subchapter 1, article 5-A or 6 or Title 38, chapter 5, subchapter 1, article 1, subarticle 1-B, as applicable, and may condition issuance of a lease for such a project on receipt of all pertinent approvals by the Department of Environmental Protection or the Maine Land Use Regulation Commission, as applicable, and other conditions the director considers reasonable.
The joint standing committee of the Legislature having jurisdiction over submerged lands matters shall review the report and submit a written recommendation regarding the bureau's proposed budget to the joint standing committee of the Legislature having jurisdiction over appropriations and financial affairs on or before March 15th of each year.
(1) The State's coastal waters and submerged lands provide unique and valuable opportunities for development of wind and tidal power and, potentially, other indigenous, renewable ocean energy resources, such as wave power;
(2) Climate change and related degradation or loss of marine resources and related human uses make development of and transition to use of renewable ocean energy resources consistent with sound stewardship of the State's public trust resources;
(3) Proper and efficient functioning of certain generation and associated facilities that use the energy potential of the State's indigenous, renewable ocean energy resources depends upon their deployment in a marine environment and, accordingly, such facilities may to the extent necessary be located in, on or over state-owned submerged lands; and
(4) With appropriate provision for avoidance and minimization of and compensation for harm to existing public trust-related uses and resources, such as fishing and navigation; restoration of affected lands upon completion of authorized uses pursuant to permitting criteria; and adequate compensation to the public for use of its trust resources pursuant to state submerged lands leasing criteria, development of these renewable ocean energy resources in appropriate locations promises significant public trust-related benefits to the people of this State for whom the State holds and manages submerged lands and their resources.
(1) No more than 30 days prior to filing applications in accordance with this paragraph, an applicant for a lease or easement for a renewable ocean energy project shall participate in a joint interagency preapplication meeting, in accordance with permitting procedures of the Department of Environmental Protection or the Maine Land Use Regulation Commission, as applicable.
(2) An applicant for a lease or easement for a renewable ocean energy project must file and certify to the director that it has filed completed applications for requisite state permits under chapter 206-A or Title 38, chapter 3, subchapter 1, article 5-A or 6 or Title 38, chapter 5, subchapter 1, article 1, subarticle 1-B, as applicable, prior to or concurrently with submission of its submerged lands lease application under this section and shall provide a copy of any such applications to the director upon request.
(3) The director may issue a lease or easement for a hydropower project, as defined in Title 38, section 632, subsection 3, that uses tidal or wave action as a source of electrical or mechanical power, for a term not to exceed 50 years, as long as the lease term is less than or equal to the term of the license for the project issued by the Federal Energy Regulatory Commission.
(4) If requested by an applicant, and with provision for public notice and comment, the director may issue one or more of the following for a renewable ocean energy project prior to issuance of a 30-year lease for the project:
(a) A lease option, for a term not to exceed 2 years, that establishes that the leaseholder, for purposes of consideration of its application for state permit approvals under chapter 206-A or Title 38, chapter 3, subchapter 1, article 5A or 6 or Title 38, chapter 5, subchapter 1, article 1, subarticle 1-B, as applicable, has title, right or interest in a specific area of state submerged lands needed to achieve the purposes of the project as described in conceptual plans in the lease application;
(b) A submerged lands lease, for a term not to exceed 3 years, that authorizes the leaseholder to undertake feasibility testing and predevelopment monitoring for ecological and human use impacts as described in conceptual plans in the lease application and conditioned on receipt of requisite federal, state and local approvals; and
(c) A submerged lands lease, for a term not to exceed 5 years, that authorizes the leaseholder to secure requisite federal, state and local approvals and complete preoperation construction, as long as the applicant provides detailed development plans describing all operational conditions and restrictions.
(5) Except as otherwise provided in this paragraph, the annual lease fee for a wind energy demonstration project for which a general permit has been issued under Title 38, section 480-HH is $10,000 per year for the term of the general permit. The annual lease fee for a tidal energy demonstration project for which a general permit has been issued under Title 38, section 636-A is $100 per acre of submerged lands occupied by the project for the term of the general project, except that the annual lease fee may not exceed $10,000. As used in this paragraph, "submerged lands occupied" includes the sum of the area on which turbines, testing and monitoring equipment, anchoring or mooring lines, submerged transmission cables or other structures are placed and any additional area from which the director finds it necessary to exclude transient public trust uses to avoid unreasonable interference with the project's purposes. An annual lease fee is not required for an offshore wind energy demonstration project located in the Maine Offshore Wind Energy Research Center, as designated by the department under section 1868, subsection 2.
(6) The director shall charge a lessee a rent in accordance with a fee schedule, established by the bureau by rule, that balances state goals of assurance of fair compensation for use and mitigation of potential adverse effects on or conflict with existing uses of state-owned submerged lands that are held in trust for the people of the State with state renewable ocean energy-related goals, including state wind energy generation goals established in Title 35-A, section 3404, subsection 2. Rules adopted pursuant to this subparagraph are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.
(7) The director may not require additional public compensation pursuant to subsection 9.
(8) The director may issue a lease for a buffer zone comprising a land or water area around permanent structures located on submerged or intertidal land if:
(a) The director determines such a buffer zone is necessary to preserve the integrity or safety of the structure or fulfill the purposes of the project; and
(b) The director consults with the Commissioner of Marine Resources regarding the need for such a buffer, its location and size and options to minimize its potential effects on existing uses.
Sec. B-2. 12 MRSA §1863, sub-§3, as repealed and replaced by PL 1999, c. 401, Pt. I, §1, is amended to read:
Sec. B-3. 12 MRSA §1863-A is enacted to read:
§ 1863-A. Renewable Ocean Energy Trust
Sec. B-4. Establishment of fee schedule for renewable ocean energy development projects. No later than one year from the effective date of this section and in accordance with the Maine Revised Statutes, Title 12, section 1862, subsection 13, paragraph B, subparagraph (6), the Department of Conservation, Bureau of Parks and Lands shall amend its submerged lands leasing rules to establish a rental fee schedule for leasing submerged lands for a renewable ocean energy project as defined in Title 12, section 1862, subsection 1, paragraph F-1 that balances state goals of assurance of fair compensation for use and mitigation of potential adverse effects on or conflict with existing uses of state-owned submerged lands that are held in trust for the people of the State with state renewable ocean energy-related goals, including state wind energy generation goals established in Title 35-A, section 3404, subsection 2. Rules adopted pursuant to this section are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A. Prior to adoption of such a fee schedule, the Director of the Bureau of Parks and Lands shall determine the rent on a case-by-case basis. In developing rules pursuant to this section, the bureau shall:
1. Establish fees that are commercially reasonable and comparable to pertinent lease fees in other jurisdictions both in terms of the fee amounts and provision for a graduated fee schedule that reflects consideration of energy production levels and debt service obligations in the initial years of a renewable ocean energy project;
2. Consider renewable ocean energy-related submerged lands leasing fees in other states; fees provided for by the United States Department of Interior, Minerals Management Service's Renewable Energy Program; current market practices in the wind power industry regarding lease arrangements; and other pertinent information;
3. Include in the fee schedule an amount adequate to cover the bureau's pertinent administrative costs;
4. Allow the developer of a renewable ocean energy project to enter into a contract for sale or use of project-generated power that, through reduced rates or otherwise, provides the State or electric consumers in this State a portion of the dollar value of the pertinent rental fee for use of state submerged lands and obligates the developer to provide monetary payment to the State for the remaining portion of the rental amount as provided in this Act;
5. Consult with and consider the recommendations of the Public Utilities Commission regarding provisions in the rules regarding subsection 4 and related permit terms and conditions for a lease for a renewable ocean energy project;
6. Clarify that potential adverse effects on existing uses, such as fishing, are addressed through the fee schedule and that the bureau may not require case-by-case payment of an amount in addition to rent as compensation for such project-specific effects;
7. Incorporate the lease fees and lease fee exemption established in Title 12, section 1862, subsection 13, paragraph B, subparagraph (5); and
8. Otherwise amend its rules for consistency with the provisions of this Act.
PART C
Sec. C-1. 36 MRSA §655, sub-§1, ¶S, as amended by PL 2005, c. 652, §1 and affected by §3, is further amended to read:
Sec. C-2. 36 MRSA §655, sub-§1, ¶T, as enacted by PL 2005, c. 652, §1 and affected by §3, is amended to read:
Sec. C-3. 36 MRSA §655, sub-§1, ¶U is enacted to read:
Sec. C-4. 36 MRSA §655, sub-§1, ¶V is enacted to read:
Sec. C-5. 36 MRSA §655, sub-§1, ¶W is enacted to read:
Sec. C-6. 36 MRSA §661, sub-§5, as enacted by PL 1985, c. 459, Pt. B, §4, is amended to read:
PART D
Sec. D-1. 12 MRSA §682, sub-§1, as amended by PL 1999, c. 333, §1, is further amended to read:
Sec. D-2. 12 MRSA §682, sub-§19 is enacted to read:
Sec. D-3. 12 MRSA §685-B, sub-§2-C, as enacted by PL 2007, c. 661, Pt. C, §2, is amended to read:
For an offshore wind energy project that is proposed within one nautical mile of an island within the unorganized or deorganized areas, the commission shall review the proposed project to determine whether the project qualifies as a community-based offshore wind energy project and therefore is within the jurisdiction of the commission.
Sec. D-4. 12 MRSA §685-B, sub-§4, as amended by PL 2007, c. 661, Pt. C, §3, is further amended to read:
The commission may not approve an application, unless:
In making a determination under this paragraph regarding an expedited wind energy development, as defined in Title 35-A, section 3451, subsection 4, or a community-based offshore wind energy project, the commission shall consider the development's effects on scenic character and existing uses related to scenic character in accordance with Title 35-A, section 3452;
The burden is upon the applicant to demonstrate by substantial evidence that the criteria for approval are satisfied, and that the public's health, safety and general welfare will be adequately protected. Except as otherwise provided in Title 35-A, section 3454, the commission shall permit the applicant and other parties to provide evidence on the economic benefits of the proposal as well as the impact of the proposal on energy resources.
Sec. D-5. 12 MRSA §685-B, sub-§4-B, as enacted by PL 2007, c. 661, Pt. C, §4, is amended to read:
Sec. D-6. Maine Land Use Regulation Commission to adopt rule. No later than December 1, 2010, the Maine Land Use Regulation Commission shall adopt a rule amending its land use districts and standards to provide that offshore wind power projects, as defined in the Maine Revised Statutes, Title 38, section 480-B, subsection 6A, and community-based offshore wind energy projects, as defined in Title 12, section 682, subsection 19, are uses requiring a permit, but not a special exception, in all subdistricts. Prior to the commission's adoption of a rule in accordance with this section, an offshore wind power project or a community-based offshore wind energy project is considered a use requiring a permit, but not a special exception, in all subdistricts.
Rules adopted by the Maine Land Use Regulation Commission pursuant to this section are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.
PART E
Sec. E-1. 38 MRSA §341-D, sub-§2, as amended by PL 2007, c. 661, Pt. B, §1, is further amended to read:
The board shall assume jurisdiction over applications referred to it under section 344, subsection 2-A, when it finds that the criteria of this subsection have been met.
The board may vote to assume jurisdiction of an application if it finds that one or more of the criteria in this subsection have been met.
Any interested party may request the board to assume jurisdiction of an application.
The board may not assume jurisdiction over an application for an expedited wind energy development as defined in Title 35-A, section 3451, subsection 4 or , for a certification pursuant to Title 35-A, section 3456 , for a natural resources protection permit pursuant to chapter 3, subchapter 1, article 5-A for an offshore wind power project as defined in section 480-B, subsection 6-A, for a site location permit pursuant to chapter 3, subchapter 1, article 6 for an offshore wind power project with an aggregate generating capacity of 3 megawatts or more as provided by section 482, subsection 2, paragraph J or for a hydropower project, as defined in section 632, subsection 3, that uses tidal action as a source of electrical or mechanical power.
Sec. E-2. 38 MRSA §341-D, sub-§4, ¶D, as enacted by PL 2007, c. 661, Pt. B, §4, is amended to read:
Sec. E-3. 38 MRSA §344, sub-§2-A, ¶A, as amended by PL 2007, c. 661, Pt. B, §5, is further amended to read:
(1) The commissioner may not request the board to assume jurisdiction of an application for any permit or other approval required for an expedited wind energy development, as defined in Title 35-A, section 3451, subsection 4, or a certification pursuant to Title 35-A, section 3456 , a natural resources protection permit pursuant to chapter 3, subchapter 1, article 5-A for an offshore wind power project as defined in section 480-B, subsection 6-A, a site location permit pursuant to chapter 3, subchapter 1, article 6 for an offshore wind power project with an aggregate generating capacity of 3 megawatts or more as provided by section 482, subsection 2, paragraph J or a hydropower project, as defined in section 632, subsection 3, that uses tidal action as a source of electrical or mechanical power. Except as provided in subparagraph (2), the commissioner shall issue a decision on an application for an expedited wind energy development , an offshore wind power project or a hydropower project, as defined in section 632, subsection 3, that uses tidal action as a source of electrical or mechanical power within 185 days of the date on which the department accepts the application as complete pursuant to this section or within 270 days of the department's acceptance of the application if the commissioner holds a hearing on the application pursuant to section 345-A, subsection 1-A.
(2) The expedited review periods of 185 days and 270 days specified in subparagraph (1) do not apply to the associated facilities, as defined in Title 35A, section 3451, subsection 1, of the development if the commissioner determines that an expedited review time is unreasonable due to the size, location, potential impacts, multiple agency jurisdiction or complexity of that portion of the development. If an expedited review period does not apply, a review period specified pursuant to section 344-B applies.
The commissioner may stop the processing time with the consent of the applicant for a period of time agreeable to the commissioner and the applicant.
Sec. E-4. 38 MRSA §344-A, first ¶, as amended by PL 2009, c. 270, Pt. A, §1, is further amended to read:
The commissioner may enter into agreements with individuals, partnerships, firms and corporations outside the department, referred to throughout this section as "outside reviewers," to review applications or portions of applications submitted to the department. The commissioner has sole authority to determine the applications or portions of applications to be reviewed by outside reviewers and to determine which outside reviewer is to perform the review. When selecting an outside reviewer, all other factors being equal, the commissioner shall give preference to an outside reviewer who is a public or quasi-public entity, such as state agencies, the University of Maine System or the soil and water conservation districts. Except for an agreement for outside review regarding review of an application for a wind energy development as defined in Title 35A, section 3451, subsection 11, a certification pursuant to Title 35-A, section 3456 , an application for an offshore wind power project as defined in section 480-B, subsection 6A or a general permit pursuant to section 480-HH or section 636-A or an application for a hydropower project, as defined in section 632, subsection 3, that uses tidal action as a source of electrical or mechanical power, the commissioner may enter into an agreement with an outside reviewer only with the consent of the applicant and only if the applicant agrees in writing to pay all costs associated with the outside review.
Sec. E-5. 38 MRSA §346, sub-§4, as enacted by PL 2007, c. 661, Pt. B, §8, is amended to read:
Sec. E-6. 38 MRSA §480-B, sub-§6-A is enacted to read:
Sec. E-7. 38 MRSA §480-D, sub-§1, as amended by PL 2007, c. 661, Pt. B, §10, is further amended to read:
In making a determination under this subsection regarding an expedited wind energy development, as defined in Title 35-A, section 3451, subsection 4, or an offshore wind power project, the department shall consider the development's or project's effects on scenic character and existing uses related to scenic character in accordance with Title 35A, section 3452. An offshore wind power project is exempt from review under this subsection insofar as the department determines that review is required under criteria specified in Title 12, section 1862, subsection 2, paragraph A, subparagraph (6).
Sec. E-8. 38 MRSA §480-D, sub-§11 is enacted to read:
(1) Will meet the requirements of the noise control rules adopted by the board pursuant to article 6;
(2) Will be designed and sited to avoid unreasonable adverse shadow flicker effects; and
(3) Will be constructed with setbacks adequate to protect public safety, while maintaining existing uses to the extent practicable. In making a finding pursuant to this paragraph, the department shall consider the recommendation of a professional, licensed civil engineer as well as any applicable setback recommended by a manufacturer of the generating facilities.
Sec. E-9. 38 MRSA §480-E, sub-§1, as enacted by PL 1989, c. 656, §4 and affected by c. 890, Pt. A, §40 and amended by Pt. B, §73, is repealed and the following enacted in its place:
(1) Notice to the Maine Land Use Regulation Commission when the proposed development is located within one mile of an area of land within the jurisdiction of the Maine Land Use Regulation Commission; and
(2) Notice to any municipality with land located within one mile of the proposed development.
The Maine Land Use Regulation Commission and any municipality notified pursuant to this paragraph may provide comments within a reasonable period established by the commissioner and the commissioner shall consider such comments.
Sec. E-10. 38 MRSA §480-E-1, first ¶, as repealed and replaced by PL 2005, c. 330, §14, is amended to read:
The Maine Land Use Regulation Commission shall issue all permits under this article for activities that are located wholly within its jurisdiction and are not subject to review and approval by the department under any other article of this chapter , except as provided in subsection 3.
Sec. E-11. 38 MRSA §480-E-1, sub-§3 is enacted to read:
Sec. E-12. 38 MRSA §482, sub-§2, ¶D, as amended by PL 1999, c. 468, §6, is further amended to read:
Sec. E-13. 38 MRSA §482, sub-§2, ¶F, as enacted by PL 1997, c. 502, §5, is amended to read:
Sec. E-14. 38 MRSA §482, sub-§2, ¶J is enacted to read:
Sec. E-15. 38 MRSA §482, sub-§8 is enacted to read:
Sec. E-16. 38 MRSA §484, sub-§3, ¶G, as enacted by PL 2007, c. 661, Pt. B, §11, is amended to read:
Sec. E-17. 38 MRSA §484, sub-§10, as enacted by PL 2007, c. 661, Pt. B, §12, is amended to read:
The Department of Labor, the Executive Department, State Planning Office and the Public Utilities Commission shall provide review comments if requested by the primary siting authority.
For purposes of this subsection, "grid-scale wind energy development," "primary siting authority," "significant tangible benefits" and "expedited wind energy development" have the same meanings as in Title 35-A, section 3451.
Sec. E-18. 38 MRSA §488, sub-§9, as repealed and replaced by PL 2005, c. 330, §19, is amended to read:
Review by the department of subsequent modifications to a development approved by the department is required. For a development or part of a development within the jurisdiction of the Maine Land Use Regulation Commission, the director of the commission may request and obtain technical assistance and recommendations from the department. The commissioner shall respond to the requests in a timely manner. The recommendations of the department must be considered by the Maine Land Use Regulation Commission in acting upon a development application.
Sec. E-19. 38 MRSA §488, sub-§25 is enacted to read:
Sec. E-20. Rulemaking. No later than June 1, 2011, the Department of Environmental Protection shall adopt rules pursuant to the Maine Revised Statutes, Title 38, chapter 3, subchapter 1, article 5-A and Title 38, section 344, subsection 7 to provide permit by rule standards for meteorological towers in coastal wetlands that are associated with resource analysis activities in anticipation of an offshore wind power project as defined by Title 38, section 480-B, subsection 6-A. The rules must specify the class of eligible activities and may establish standards of location, design, construction or use that the department considers necessary to avoid adverse environmental impacts. These rules are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.
PART F
Sec. F-1. 12 MRSA §685-B, sub-§1-A, ¶E, as enacted by PL 2009, c. 270, Pt. D, §4, is amended to read:
Sec. F-2. 38 MRSA §634-A, sub-§1, ¶B, as enacted by PL 2009, c. 270, Pt. D, §5, is amended to read:
Sec. F-3. 38 MRSA §634-A, sub-§2, as enacted by PL 2009, c. 270, Pt. D, §5, is amended to read:
Sec. F-4. 38 MRSA §636, sub-§5, as amended by PL 2009, c. 270, Pt. D, §7, is further amended to read:
PART G
Sec. G-1. 30-A MRSA §4352, sub-§4, as amended by PL 2007, c. 656, Pt. A, §2, is further amended to read:
Sec. G-2. 30-A MRSA §4361 is enacted to read:
§ 4361. Coordination of state and municipal decision making; renewable ocean energy projects
Emergency clause. In view of the emergency cited in the preamble, this legislation takes effect when approved.
summary
This bill implements the recommendations of the Governor's Ocean Energy Task Force.
Part A accomplishes the following.
It amends the Maine Wind Energy Act to:
1. Articulate state policy regarding transition to electric power to meet Maine's heating and transportation needs and recognize the key role of ocean wind and other renewable energy resources in accomplishing that transition over time;
2. Clarify that state policy encouraging siting of wind energy includes support for new transmission infrastructure needed to transport additional onshore and offshore wind energy to market; and
3. Establish the state goal of 8,000 megawatts of installed wind energy capacity, including 5,000 megawatts of offshore wind power, by 2030.
It authorizes the Public Utilities Commission, in issuing a certificate of public convenience and necessity for a transmission line that it has designated as an energy infrastructure corridor under the Maine Revised Statutes, Title 35-A, section 122, subsection 2, to consider anticipated future growth in electric power demand in determining if such a line is needed to attain state wind energy goals for generating facilities located in coastal waters, to allow a transmission and distribution utility to construct and own such a line under specified circumstances and to allow the recovery of the reasonable costs of construction of such a line through electric rates under specified circumstances.
It amends the Maine Waterway Development and Conservation Act to articulate that it is the policy of the State to support and encourage tidal power development at appropriate locations.
It directs the Department of Environmental Protection, in consultation with the Public Utilities Commission, the Finance Authority of Maine and the Efficiency Maine Trust, if adequate funding is received, to develop a program that provides incentives for Maine homeowners and business owners to convert their fossil fuel-powered home heating systems to more efficient, less polluting electric-powered systems.
It directs the Finance Authority of Maine, in consultation with the Department of Environmental Protection, the Public Utilities Commission and the Efficiency Maine Trust, to work to establish a moral obligation credit enhancement program to reduce financing costs of electric ratepayer-backed renewable ocean energy projects and projects for conversion to electric heating that do not pose a significant risk of financial loss to the State and that will support the goals of assisting in the development of commercial-scale renewable ocean energy projects or the conversion of energy demand away from the use of oil and gas as a primary energy source.
It directs the Public Utilities Commission to conduct a competitive solicitation for proposals for offshore wind, tidal and wave energy produced by one or more projects employing generating facilities located in the State's coastal waters or adjoining federal waters and authorizes the commission to negotiate a long-term contract with a technically competent generator for such energy if the contract terms would not have an unreasonable rate impact.
It directs the Executive Department, Governor's Office of Energy Independence and Security to amend the state energy plan to acknowledge the need for new transmission capacity to support attainment of state offshore wind energy generation goals.
It directs the Maine Port Authority to assess and make a recommendation regarding acquisition of real estate near existing port facilities in the State needed to facilitate renewable ocean energy development opportunities.
Part B amends the State's submerged lands leasing law to enact special provisions regarding renewable ocean energy projects, including clarification of the compatibility of such projects with public trust-related stewardship of submerged lands, fees for demonstration projects and further coordination of lease approval criteria and procedures with related state permitting requirements.
It establishes the Renewable Ocean Energy Trust to protect and enhance the integrity of public trust-related resources and related human uses of the State's submerged lands. Eighty percent of rental fees charged for leasing state submerged lands for renewable ocean energy projects, in addition to the State's share of federal revenues from leasing areas in federal waters for such projects, is deposited in the trust. Twenty percent of the rental fees is deposited in the existing Shore and Harbor Management Fund. Funds from the trust would be provided to the Department of Marine Resources for specified resource enhancement and compensation purposes.
It directs the Department of Conservation, Bureau of Parks and Lands to amend its submerged lands leasing rules to establish a rental fee schedule for leasing submerged lands for commercial-scale offshore wind and other renewable ocean energy projects.
It specifies that such fees must be commercially reasonable and balance state goals of assurance of fair compensation for use and mitigation of potential adverse effects on or conflict with existing uses of state-owned submerged lands with state wind and other renewable ocean energy-related goals.
It specifies criteria that the bureau must consider in establishing these fees.
It specifies that the rules must allow a developer of a renewable ocean energy project to enter into a power sales contract that, through reduced rates or otherwise, provides the electric consumers a portion of the rental fee and obligates the developer to provide monetary payment to the State for the remaining portion of the fee.
Part C clarifies that a municipality may tax renewable ocean energy-generating machinery, equipment or related components located on state submerged lands that are installed within the boundaries of the municipality, as established by its legislative charter, prior to the effective date of this provision. The bill provides that, for purposes of this provision, there is a rebuttable presumption that the boundaries of a municipality in the coastal area do not extend below the mean low-water line on waters subject to tidal influence.
It also clarifies that renewable ocean energy-generating machinery, equipment and related components that are in transit to be located in, on or above state submerged lands and are within the State on the first day of April of the applicable tax year are exempt from taxation.
It also specifies that renewable ocean energy-generating machinery, equipment and related components that are located in, on or above state submerged lands in the unorganized territory are exempt from taxation and provides that the unorganized territory is not entitled to reimbursement for the tax exemption.
Part D amends the definition of "unorganized and deorganized areas" in the laws governing land use regulation to include, for the limited purpose of permitting community-based offshore wind energy projects and structures associated with resource analysis activities necessary for such intended projects, the siting of such projects and resource analysis structures. It defines "community-based offshore wind energy project," which is the type of small-scale offshore wind energy project subject to permitting by the Maine Land Use Regulation Commission.
It provides for permit processing timelines and procedures for a community-based offshore wind energy project that are the same as for an expedited wind energy development.
It applies specific scenic character review criteria for a community-based offshore wind energy project consistent with the criteria for an expedited wind energy development and provides that an application for a community-based offshore wind energy project is exempt from review under the Maine Revised Statutes, Title 12, section 685-B, subsection 4 to the extent the Maine Land Use Regulation Commission determines that review and findings are required under criteria specified in Title 12, section 1862, subsection 2, paragraph A, subparagraph (6).
It provides for specific review criteria regarding noise control, shadow flicker and safety setbacks for a community-based offshore wind energy project.
It requires the Maine Land Use Regulation Commission to adopt routine technical rules to allow an offshore wind power project and a community-based offshore wind energy project as uses requiring a permit, but not a special exception, in all applicable subdistricts and establishes the same on an interim basis.
Part E makes several changes in the law regarding the issuance of permits for offshore wind power projects under the Natural Resources Protection Act and the site location of development law, and of permits for tidal power projects under the Maine Waterway Development and Conservation Act.
1. It provides that the Board of Environmental Protection may not assume jurisdiction over an application for any of those permits.
2. It provides that, in reviewing an appeal of a permit decision by the Commissioner of Environmental Protection on an application for any of those permits, the Board of Environmental Protection base its decision on the administrative record.
3. It provides that the Commissioner of Environmental Protection may not request that the Board of Environmental Protection assume jurisdiction over an application for any of those permits.
It also requires the commissioner to issue a decision on an application for an offshore wind power project or tidal power project within 185 days, or 270 days if the commissioner holds a hearing. This review period does not apply to a project's associated facilities if the commissioner determines that such a review time is unreasonable due to the size, location, potential impacts, multiple agency jurisdiction or complexity of that portion of the development.
It adds offshore wind power projects subject to the Natural Resources Protection Act or the site location of development law and tidal power projects subject to the Maine Waterway Development and Conservation Act to the category of projects for which the Commissioner of Environmental Protection may contract for outside review services, at the applicant's expense, without the applicant's consent.
It provides that a person aggrieved by an order or decision of the Commissioner of Environmental Protection or Board of Environmental Protection regarding an application for any of those permits may appeal to the Supreme Judicial Court sitting as the law court.
It adds a definition of "offshore wind power project" to the Natural Resources Protection Act.
It provides that in making a determination under Title 38, section 480-D, subsection 1 concerning an offshore wind power project, the Department of Environmental Protection shall consider the project's effects on scenic character and existing uses related to scenic character in accordance with Title 35-A, section 3452.
It adds a provision to the standards of the Natural Resources Protection Act that addresses certain issues related to an offshore wind power project that does not also require a permit under the site location of development law.
It amends a notification provision to provide that the Department of Environmental Protection may not review an application for an offshore wind power project without providing notice to the Maine Land Use Regulation Commission when the proposed development is within one mile of an area of land within the jurisdiction of the commission and notice to any municipality with land located within one mile of the proposed development. The Maine Land Use Regulation Commission and any municipality notified may provide comments within a reasonable period established by the Commissioner of Environmental Protection and the commissioner shall consider these comments.
It provides that the Department of Environmental Protection shall issue all permits under the Natural Resources Protection Act for offshore wind power projects except for community-based offshore wind energy projects as defined in Title 12, section 682, subsection 19.
It provides that a permit is required pursuant to the site location of development law for an offshore wind energy project with an aggregate generating capacity of 3 megawatts or more.
It adds a definition of "offshore wind power project" to the site location of development law.
It provides that in making a determination regarding an offshore wind power project with an aggregate generating capacity of 3 megawatts or more, the Department of Environmental Protection shall consider the project's effects on scenic character and existing uses related to scenic character in accordance with Title 35-A, section 3452.
It provides that an offshore wind power project with an aggregate generating capacity of 3 megawatts or more must avoid unreasonable shadow flicker effects, provide safety-related setbacks and provide significant tangible benefits, as required for a grid-scale wind energy development.
It provides that an offshore wind power project with an aggregate generating capacity of 3 megawatts or more that is located entirely within an area subject to the jurisdiction of the Maine Land Use Regulation Commission is not exempt from the site location of development law unless it is a community-based offshore wind energy project.
It provides that an offshore wind power project with an aggregate generating capacity of 3 megawatts or more is exempt from review under the existing use standard in Title 38, section 484, subsection 3 insofar as review is also required by the Department of Conservation under criteria specified in Title 12, section 1862, subsection 2, paragraph A, subparagraph (6), as determined by the Department of Environmental Protection.
It provides that the Department of Environmental Protection shall develop a permit by rule for offshore wind power project-related meteorological towers in coastal wetlands.
Part F amends the Maine Waterway Development and Conservation Act to provide that the Department of Environmental Protection has statewide jurisdiction over wave power projects under that law.
Part G expands the Public Utilities Commission's existing authority to exempt real estate of an entity to which the commission has issued a certificate of public convenience and necessity wholly or in part from a local ordinance to include real estate used for a renewable ocean energy project if, following public notice and comment, the commission determines the exemption reasonably necessary for public welfare and convenience.
It clarifies and limits the scope of a municipality's land use and zoning authority to promote consistency with pertinent state standards and requirements regarding offshore wind energy development.