|
latest Federal Decennial Census as a census designated place, | or a compact area of an urban compact municipality as defined | by Title 23, section 754; or |
|
| C.__Areas other than those described in paragraph A or B for | the following projects: |
|
| (1)__A project certified to the Land and Water | Resources Council established in Title 5, section 3331 | by the head of the agency funding the project as | necessary to remedy a threat to public health or safety | or to comply with environmental clean-up laws; |
|
| (2)__An acquisition of land for a park, conservation, | open space or public access or acquisition of an | agricultural, conservation or historic easement; |
|
| (3)__A project related to a commercial or industrial | activity that, due to its operational or physical | characteristics, typically is located away from other | development, including natural resource-based industry, | such as an agricultural operation, forestry, mineral | extraction or power generation; an airport, port or | railroad or industry that must be proximate to an | airport, a port or a railroad line or terminal; and a | pollution control facility; |
|
| (4)__A project that increases the capacity of a highway | or bridge that is part of the national highway system | or an arterial if the project addresses a regionwide or | statewide need and if the project incorporates best | access management practices; |
|
| (5)__A project that maintains, expands or promotes a | tourist or cultural facility that is required to be | proximate to a specific historic, natural or cultural | resource; |
|
| (6)__A project located in a municipality that has none | of the geographic areas described in paragraph A or B | and that prior to January 1, 2000 formally requested | but had not received from the office funds to assist | with the preparation of a comprehensive plan or that | received funds to assist with the preparation of a | comprehensive plan within the previous 2 years. This | exception expires for a municipality 2 years after such | funds are received; or |
|
| (7)__A project certified to the Land and Water Resources Council | established in Title 5, section 3331 |
|
|