| | |
(4) The residual radioactivity distinguishable from | | background radiation in groundwater sources of drinking | | water results in a total effective dose equivalent of not | | more than 4 millirems, or 0.04 millisievert, per year to | | the average member of the critical group. |
|
| | | A nuclear facility owner shall demonstrate compliance with | | subparagraphs (1) to (4) using actual measurements and the | | analytic methodology approved by the United States Nuclear | | Regulatory Commission and supplemented by modeling the | | effects of engineering controls that have been designed to | | reduce exposure. |
|
| | | In order to determine compliance with subparagraphs (1) to | | (4), the department may require appropriate testing and | | analysis, including, but not limited to, analysis of the | | effectiveness and integrity of engineering controls. |
|
| | | B.__As used in this subsection, unless the context otherwise | | indicates, the following terms have the following meanings. |
|
| | | (1)__"Average member of the critical group" means a | | member of the critical group who is subjected to the | | most likely exposure situation based on prudently | | conservative exposure assumptions and parameter values | | within the model calculations. |
|
| | | (2)__"Critical group" means the group of individuals | | reasonably expected to receive the greatest exposure to | | residual radioactivity for any applicable set of | | circumstances. |
|
| | | (3)__"Nuclear facility owner" means the owner of a | | nuclear power plant or decommissioned nuclear power | | plant in the State. |
|
| | | (4)__"Total effective dose equivalent" has the same | | meaning as in 10 Code of Federal Regulations, Section | | 20.1003, as in effect on January 1, 2000. |
|
| | | This bill clarifies the existing low-level waste law by | | providing that a decommissioned nuclear facility at which the | | radioactive material is removed only in accordance with federal | | standards is subject to approval by the voters in a statewide | | referendum. It also provides that such a facility is subject to | | referendum even if it has not been approved as a low-level waste |
|
|