LD 408
pg. 1
LD 408 Title Page An Act to Expand the Jurisdiction of the Maine Turnpike Authority to Include an... LD 408 Title Page
Download Bill Text
LR 1128
Item 1

 
Be it enacted by the People of the State of Maine as follows:

 
Sec. 1. 23 MRSA §1965-B is enacted to read:

 
§1965-B.__Construction of an east-west highway

 
The authority shall construct, maintain and operate a 4-lane
toll highway from a point in or near Bangor in Penobscot County
through Calais in Washington County to a point at or near the
Canadian border.

 
SUMMARY

 
This bill requires the Maine Turnpike Authority to construct,
maintain and operate a 4-lane toll highway from a point in or
near Bangor in Penobscot County through Calais in Washington
County to a point at or near the Canadian border.


LD 408 Title Page Top of Page LD 408 Title Page