LD 1398
pg. 1
LD 1398 Title Page An Act To Modify Water Well Reporting Requirements LD 1398 Title Page
Download Bill Text
LR 1960
Item 1

 
Be it enacted by the People of the State of Maine as follows:

 
Sec. 1. 12 MRSA §550-B, sub-§1, ¶B, as enacted by PL 1987, c. 509, is
repealed.

 
Sec. 2. 12 MRSA §550-B, sub-§1, ¶C is enacted to read:

 
C.__"Well drilling company" means a person, firm,
partnership or corporation that owns or otherwise operates
any mechanical equipment used to drill, drive or bore
water wells.

 
Sec. 3. 12 MRSA §550-B, sub-§3, ¶A, as amended by PL 1999, c. 556,
§16, is further amended to read:

 
A. Within 180 30 days after completion of any well or dry
hole, or the enlarging or deepening of an existing well, a
well contractor drilling company shall submit a report to
the Bureau of Geology and Natural Areas, on forms designed
and provided by the Bureau of Geology and Natural Areas.
The report must contain information as may be required by
the Bureau of Geology and Natural Areas, including, but
not limited to, location, construction and well yield.

 
Sec. 4. 12 MRSA §550-B, sub-§3, ¶B, as enacted by PL 1987, c. 509, is
amended to read:

 
B. Any well contractor who drilling company that has
engaged in the construction of water wells, but who has
not submitted well completion reports on a timely basis as
required by this chapter, shall be is in violation of this
chapter.

 
Sec. 5. 12 MRSA §550-B, sub-§5, as enacted by PL 1987, c. 509, is
amended to read:

 
5. Penalties. Any person, company, firm, partnership or
corporation, who A well drilling company that violates any
standard or provision of this chapter, commits a civil
violation for which a forfeiture of not more than $500 may be
adjudged. In addition to other civil remedies, the court may
issue an injunction.

 
SUMMARY

 
This bill makes the definition of the entity responsible for
submitting water well information to the State consistent with
other laws. The bill reduces the time allowed for the company
to submit the information from 6 months to 30 days, which is
consistent with the time required by the Maine Water Well
Commission.


LD 1398 Title Page Top of Page LD 1398 Title Page