LD 1600
pg. 238
Page 237 of 361 PUBLIC Law Chapter 414 Page 239 of 361
Download Chapter Text
LR 2121
Item 1

 
B.__If any interested person requests a public hearing, the
commissioner shall, within 30 days, either notify the
petitioners in writing of the commissioner's denial, stating
the reasons for the denial, or schedule a public hearing.__
The commissioner shall hold a public hearing whenever:

 
(1)__The commissioner is petitioned by 50 or more residents
of the State; or

 
(2)__The owner, lessee or other person in control of the
dam or artificial obstruction requests a hearing.

 
C.__The commissioner shall accept testimony from the owner,
lessee or other person in control of the dam or artificial
obstruction on alternate fishway designs to those proposed
by the commissioner for that dam or artificial obstruction.

 
6.__Decision.__In the event that the commissioner decides that
a fishway should be constructed, repaired, altered or maintained
pursuant to this section, the commissioner shall issue final
orders with specific plans and descriptions of the fishway
construction, alteration, repair or maintenance requirements, the
conditions of the use of the fishway and the time and manner
required for fishway operation. The commissioner may issue a
decision requiring the owners, lessees or other persons in
control of the dam or obstruction to construct, repair, alter or
maintain a fishway.__Such a decision must be supported by a
finding based on evidence submitted to the commissioner that
either of the following conditions exist:

 
A.__One or more species of anadromous or migratory fish can
be restored in substantial numbers to the watershed by
construction, alteration, repair or maintenance of a fishway
and habitat anywhere in the watershed above the dam or
obstruction is sufficient and suitable to support a
substantial commercial or recreational fishery for one or
more species of anadromous or migratory fish; or

 
B.__The construction, alteration, repair or maintenance of a
fishway is necessary to protect or enhance rare, threatened
or endangered fish species.

 
In the event that the commissioner decides that no fishway should
be constructed, the commissioner shall specify in that decision a
period subsequent to that decision during which no fishway may be
required to be constructed. That period may not exceed 5 years.

 
7.__Compliance.__The owner, lessee or other person in control
of a dam or other artificial obstruction is jointly and severally
liable for the costs of fishway design, construction,


Page 237 of 361 Top of Page Page 239 of 361
Related Pages
  Search Bill Text Legislative Information
Bill Directory Search
Bill
Status
Session Information
119th Legislature Bills Maine Legislature

Office of Legislative Information
100 State House Station
Augusta, ME 04333
voice: (207) 287-1692
fax: (207) 287-1580
tty: (207) 287-6826
Word Viewer for Windows Disclaimer