| B.__If any interested person requests a public hearing, the | commissioner shall, within 30 days, either notify the | petitioners in writing of the commissioner's denial, stating | the reasons for the denial, or schedule a public hearing.__ | The commissioner shall hold a public hearing whenever: |
|
| (1)__The commissioner is petitioned by 50 or more residents | of the State; or |
|
| (2)__The owner, lessee or other person in control of the | dam or artificial obstruction requests a hearing. |
|
| C.__The commissioner shall accept testimony from the owner, | lessee or other person in control of the dam or artificial | obstruction on alternate fishway designs to those proposed | by the commissioner for that dam or artificial obstruction. |
|
| | 6.__Decision.__In the event that the commissioner decides that | a fishway should be constructed, repaired, altered or maintained | pursuant to this section, the commissioner shall issue final | orders with specific plans and descriptions of the fishway | construction, alteration, repair or maintenance requirements, the | conditions of the use of the fishway and the time and manner | required for fishway operation. The commissioner may issue a | decision requiring the owners, lessees or other persons in | control of the dam or obstruction to construct, repair, alter or | maintain a fishway.__Such a decision must be supported by a | finding based on evidence submitted to the commissioner that | either of the following conditions exist: |
|
| A.__One or more species of anadromous or migratory fish can | be restored in substantial numbers to the watershed by | construction, alteration, repair or maintenance of a fishway | and habitat anywhere in the watershed above the dam or | obstruction is sufficient and suitable to support a | substantial commercial or recreational fishery for one or | more species of anadromous or migratory fish; or |
|
| B.__The construction, alteration, repair or maintenance of a | fishway is necessary to protect or enhance rare, threatened | or endangered fish species. |
|
| In the event that the commissioner decides that no fishway should | be constructed, the commissioner shall specify in that decision a | period subsequent to that decision during which no fishway may be | required to be constructed. That period may not exceed 5 years. |
|
| | 7.__Compliance.__The owner, lessee or other person in control | of a dam or other artificial obstruction is jointly and severally | liable for the costs of fishway design, construction, |
|
|