natural buffer strip between quarries owned by abutting owners may | | be eliminated with the abutter's written permission if the | | elimination of this natural buffer strip does not increase the | | runoff from either excavation across the property boundary. Any | | written permission to reduce a buffer must provide that it remains | | in effect until mining ceases and must be recorded in the registry | | of deeds. All property boundaries must be identified in the field | | by markings such as metal posts, stakes, flagging or blazed trees. | | The department may not grant a variance from the provisions of this | | subsection. |
|
| | | 8. Erosion and sedimentation control. All reclaimed and | | unreclaimed areas, except for access roads, must be naturally | | internally drained at all times unless a variance is obtained | | from the department. Stockpiles consisting of topsoil to be used | | for reclamation must be seeded, mulched or otherwise temporarily | | stabilized. |
|
| | | A. Sediment may not leave the parcel or enter a protected | | natural resource. |
|
| | | B. Grubbed areas not internally drained must be stabilized. |
|
| | | C. Erosion and sedimentation control for access roads must | | be conducted in accordance with the department's best | | management practices for erosion and sedimentation control. | | Areas that are not naturally internally drained must meet | | the standards of section 420-C. |
|
| | | The department may not grant a variance from the provisions of | | paragraph A, B or C. Areas are not considered "naturally | | internally drained" if surface discharge is impeded through the | | use of structures such as detention ponds, retention ponds and | | undersized culverts. |
|
| | | Sec. 12. 38 MRSA §490-Z, sub-§9, as enacted by PL 1995, c. 700, §35, | | is repealed and the following enacted in its place: |
|
| | | 9. Water quality protection and storm water management.__ | | Standards of the laws governing storm water management and waste | | discharge must be met as provided in this subsection. |
|
| | | A.__An area that is not naturally internally drained must | | meet storm water standards adopted pursuant to section 420-D | | if the total area requiring such a variance on the parcel | | would be of sufficient size to require a storm water | | management permit but for the exception from storm water | | management permitting requirements for certain excavations | | in section 420-D, subsection 5.__A storm water management | | permit is not required. |
|
|