An Act To Implement the Recommendations of the Governor's Ocean Energy Task Force
Emergency preamble. Whereas, acts and resolves of the Legislature do not become effective until 90 days after adjournment unless enacted as emergencies; and
Whereas, in 2008, crude oil prices reached $147 per barrel, and gasoline and heating oil prices reached over $4 per gallon, highlighting our State's long over-reliance on oil for home-heating and fuel for our vehicles and on natural gas and other fossil fuels to produce electricity; and
Whereas, along with the foreseeable prospect of prolonged high or higher fossil fuel prices, the implications of climate change, driven by greenhouse gas emissions from combustion of fossil fuels, and its attendant threats to the environment, economy, social fabric and human health underscore the urgent need to significantly reduce and minimize our State's dependence on oil and gas; and
Whereas, renewable ocean energy holds enormous promise to address our state and regional energy goals, including energy independence and security and limiting exposure to fossil fuels' price and supply volatility; to ensure attainment of our greenhouse gas emissions reduction goals; and to provide significant economic opportunities for our citizens; and
Whereas, state and adjoining federal waters feature significant offshore wind, tidal and wave power energy resources, including world-class and untapped deep-water wind resources with the potential to make a significant contribution to the State's energy sources to meet the State's changing needs for renewable sources of light and power, heat and transportation fuel; to meet the State's ambitious renewable energy portfolio standards; and to position the State to be an exporter of clean, renewable indigenous energy; and
Whereas, the Governor's Ocean Energy Task Force identified and made recommendations to overcome economic, technical and regulatory obstacles and to provide economic incentives for vigorous and efficient development of these promising indigenous, renewable ocean energy resources in ways that recognize the concurrent need to sustain the ongoing biological integrity of the State's waters, the vitality and productivity of ocean harvests and the differing needs and uses of the seas and other natural resources and to ensure the provision of these benefits to the people of the State by careful use of such public resources for renewable ocean energy production; and
Whereas, although additional research and related technological advances are needed for efficient commercialization of deep-water offshore wind power, varied and significant potential public benefits attributable to development and transition over time to optimal use of this resource and the State's other renewable ocean energy resources necessitates timely action to position the State to capture these benefits for the people of the State; and
Whereas, in the judgment of the Legislature, these facts create an emergency within the meaning of the Constitution of Maine and require the following legislation as immediately necessary for the preservation of the public peace, health and safety; now, therefore,
PART A
Sec. A-1. 35-A MRSA §3132, sub-§6, as amended by PL 2009, c. 309, §3, is further amended to read:
Sec. A-2. 35-A MRSA §3402, sub-§1, as enacted by PL 2007, c. 661, Pt. A, §4, is amended to read:
Sec. A-3. 35-A MRSA §3404, sub-§1, as enacted by PL 2007, c. 661, Pt. A, §6, is amended to read:
Sec. A-4. 35-A MRSA §3404, sub-§2, as enacted by PL 2007, c. 661, Pt. A, §6, is amended to read:
Sec. A-5. 38 MRSA §631, sub-§3 is enacted to read:
Sec. A-6. Competitive solicitation; long-term contracts; deep-water offshore wind energy pilot projects and tidal energy demonstration projects. By September 1, 2010, in accordance with the Maine Revised Statutes, Title 35-A, section 3210-C, except as otherwise provided by this section, the Public Utilities Commission shall conduct a competitive solicitation for proposals for long-term contracts to supply installed capacity and associated renewable energy and renewable energy credits from one or more deep-water offshore wind energy pilot projects or tidal energy demonstration projects.
The commission shall consult with the University of Maine, Department of Industrial Cooperation, Office of Research and Economic Development and the Department of Economic and Community Development in developing the request for proposals under this section and in its review of proposals submitted in response to the request.
Subject to the requirements of this section, the commission may direct one or more transmission and distribution utilities, as appropriate, to enter into a long-term contract of up to 20 years for the installed capacity and associated renewable energy and renewable energy credits of one or more deep-water offshore wind energy pilot projects or tidal energy demonstration projects.
For purposes of this section, "deep-water offshore wind energy pilot project" means a wind energy development, as defined by Title 35-A, section 3451, subsection 11, that is connected to the electrical transmission system located in the State and employs one or more floating wind energy turbines in the Gulf of Maine at a location 300 feet or greater in depth no less than 10 nautical miles from any land area of the State other than coastal wetlands, as defined by Title 38, section 480B, subsection 2, or an uninhabited island. "Tidal energy demonstration project" has the same meaning as in Title 38, section 636A, subsection 1, paragraph A.
1. Following review of proposals submitted in response to the competitive solicitation, the commission may negotiate with one or more potential suppliers to supply an aggregate total of no more than 30 megawatts of installed capacity and associated renewable energy and renewable energy credits from deep-water offshore wind energy pilot projects or tidal energy demonstration projects as long as no more than 5 megawatts of the total is supplied by tidal energy demonstration projects. Consistent with such negotiations, the commission may direct one or more transmission and distribution utilities, as appropriate, to enter into a long-term contract under this section only if the commission determines that the potential supplier:
2. To mitigate any impacts of a long-term contract entered into under this section on electric rates, the commission shall:
The commission may not approve any long-term contract under this section that would result in an increase in electric rates in any customer class that is greater than the amount of the assessment charged under Title 35-A, section 10110, subsection 4 at the time that the contract is entered.
Any contract entered into pursuant to this section must require that the deep-water offshore wind energy pilot project or tidal energy demonstration project, as appropriate, be constructed and operating within 5 years of the date the contract is finalized, unless the commission and project developer mutually agree to a longer time period.
In purchasing electricity for state-owned buildings pursuant to Title 5, section 1766A, the State shall consider the ocean wind green power offer. In purchasing electricity for the university system, the University of Maine System shall consider the ocean wind green power offer.
Sec. A-7. Review of terms and conditions for long-term contracts for renewable ocean energy. No later than January 15, 2012, the Executive Department, Governor's Office of Energy Independence and Security shall make a recommendation to the joint standing committee of the Legislature having jurisdiction over utilities and energy matters regarding terms and conditions for long-term contracts for installed capacity and associated renewable energy and renewable energy credits produced by renewable ocean energy projects, except for those addressed in section 8. For the purposes of this section, "renewable ocean energy project" has the same meaning as in the Maine Revised Statutes, Title 12, section 1862, subsection 1, paragraph F1. In making a recommendation under this section, the office shall, at a minimum, consider the following issues:
1. Risks to ratepayers associated with fossil fuel price volatility over the next 20 years;
2. State goals for the reduction of greenhouse gas emissions established in Title 38, section 576;
3. State wind energy generation goals under Title 35-A, section 3404, subsection 2; and
4. Other potential benefits attributable to the development of offshore wind, tidal and wave energy projects, including but not limited to public health, job creation and other economic benefits and energy security.
Sec. A-8. State energy plan amendment. No later than September 15, 2010, the Executive Department, Governor's Office of Energy Independence and Security shall amend the state energy plan under Title 2, section 9 to acknowledge the need for new transmission capacity to support attainment of state offshore wind energy generation goals established in the Maine Revised Statutes, Title 35-A, section 3404, subsection 2.
Sec. A-9. Assess the need for port-side land acquisition. No later than January 15, 2011, the Maine Port Authority shall assess existing port facilities in the State and make a recommendation to the joint standing committees of the Legislature having jurisdiction over transportation matters and utilities and energy matters regarding acquisition of real estate needed to facilitate renewable ocean energy development opportunities.
PART B
Sec. B-1. 12 MRSA §1862, as amended by PL 2009, c. 270, Pt. B, §1 and c. 316, §§1 to 6 and affected by §7, is further amended to read:
§ 1862. Submerged and intertidal lands owned by State
(1) An offshore wind power project, as defined by Title 38, section 480-B, subsection 6-A or by Title 38, section 482, subsection 8, and with an aggregate generating capacity of 3 megawatts or more;
(2) A community-based offshore wind energy project, as defined by section 682, subsection 19;
(3) A hydropower project, as defined by Title 38, section 632, subsection 3, that uses tidal or wave action as a source of electrical or mechanical power; or
(4) Other development activity that produces electric or mechanical power solely through use of wind, waves, tides, currents, ocean temperature clines, marine biomass or other renewable sources in, on or over the State's coastal waters, as defined by section 6001, subsection 6, to the 3-mile limit of state ownership recognized under the federal Outer Continental Shelf Lands Act, 43 United States Code, Chapter 29, Subchapter III (2009), and that includes both "generating facilities," as defined by Title 35-A, section 3451, subsection 5 and "associated facilities," as defined by Title 35-A, section 3451, subsection 1.
(1) The Except as otherwise provided by subsection 13, the director shall charge the lessee a rent that practically approximates the fair market rental value of the submerged land. The reduction factors and base rate for use categories are as follows:
(a) A reduction factor of 0% with no base rate or rental fee for nonprofit organizations or publicly owned facilities that offer free public use or public use with nominal user fees. Public uses include, but are not limited to, municipal utilities and facilities that provide public access to the water, town wharves, walkways, fishing piers, boat launches, parks, nature reserves, swimming or skating areas and other projects designed to allow or enhance public recreation, fishing, fowling and navigation and for which user fees are used exclusively for the maintenance of the facility;
(b) A reduction factor of 0.1% plus a base rate of $0.025 per square foot for commercial fishing uses of renewable aquatic resources. Commercial uses of renewable aquatic resources include, but are not limited to, facilities that are directly involved in commercial fishing activities. Such facilities include, but are not limited to, fish piers, lobster impoundments, fish processing facilities and floats or piers for the storage of gear;
(c) A reduction factor of 2% for any slip space rented or otherwise made available for private use by commercial fishing boats for a fee;
(d) A reduction factor of 0.2% plus a base rate of $0.05 per square foot for water-dependent commerce, industry and private uses. Water-dependent commerce, industry and private uses other than commercial uses of renewable aquatic resources include, but are not limited to, all facilities that are functionally dependent upon a waterfront location, can not reasonably be located or operated on an upland site or are essential to the operation of the marine industry. Such facilities include, but are not limited to, privately owned piers and docks, cargo ports, private boat ramps, shipping and ferry terminals, tug and barge facilities, businesses that are engaged in watercraft construction, maintenance or repair, aquariums and the area within marinas occupied by service facilities, gas docks, breakwaters and other structures not used for slip space;
(e) A reduction factor of 4% for any slip space rented or otherwise made available for private use for recreational boats for a fee; and
(f) A reduction factor of 0.2% for upland uses and fill located on submerged lands prior to July 1, 2009 and 0.4% for new upland uses and fill after July 1, 2009 plus a base rate of $0.05 per square foot. Upland uses include, but are not limited to, all uses that can operate in a location other than on the waterfront or that are not essential to the operation of the marine industry. These facilities include, but are not limited to, residences, offices, restaurants and parking lots. Fill must include the placement of solid material other than pilings or other open support structures upon submerged lands.
If the director determines that the municipally assessed value of the adjacent upland is not an accurate indicator of the value of submerged land, the director may make adjustments in the municipally assessed value so that it more closely reflects the value of comparable waterfront properties in the vicinity or require the applicant to provide an appraisal of the submerged land. The appraisal must be approved by the director.
For offshore projects where municipally assessed value for the adjacent upland or submerged lands appraisals are unavailable or the director determines that such assessment or appraisals do not accurately indicate the value of the submerged land, the director may establish the submerged lands annual rental rate and other public compensation as appropriate by negotiation between the bureau and the applicant. In such cases the annual rent and other public compensation must take into account the proposed use of the submerged lands, the extent to which traditional and customary public uses may be diminished, the public benefit of the project, the economic value of the project and the avoided cost to the applicant. If the State's ability to determine the values listed in this paragraph or to carry out negotiations requires expertise beyond the program's capability, the applicant must pay for the costs of contracting for such expertise;
(2) After October 1, 1990, the director may revalue all existing rents to full fair market rental value. Rents for all uses except slip space may be adjusted annually as needed over a period not to exceed 5 years until the full fair market rental value is reached. After the full fair market rental value is reached, the director may revalue rents for all uses except slip space every 5 years based on changes in municipally assessed value and programmatic cost adjustments to the base rate. Adjustments to the base rate may not exceed 4% per year. Rents for slip space may fluctuate annually depending on the gross income of the facility;
(3) The Except as otherwise provided by subsection 13, the director may also lease a buffer zone of not more than 30 feet in width around a permanent structure located on submerged or intertidal land, provided that as long as the lease is necessary to preserve the integrity and safety of the structure and that the Commissioner of Marine Resources consents to that lease;
(4) Any existing or proposed lease may be subleased for the period of the original lease for the purpose of providing berthing space for any boat or vessel;
(5) No portion of an existing or proposed lease may be transferred from a person subleasing that portion to provide berthing space for any boat or vessel except for a transfer to heirs upon death of the sublessee holder or a transfer to the original leaseholder subject to terms agreed to by the lessor and sublessee at the time of the sublease. This subparagraph does not apply to any subleasing arrangements entered into before June 15, 1989; and
(6) The director may grant the proposed lease if the director finds that, in addition to any other findings that the director may require, the proposed lease:
(a) Will not unreasonably interfere with navigation;
(b) Will not unreasonably interfere with fishing or other existing marine uses of the area;
(c) Will not unreasonably diminish the availability of services and facilities necessary for commercial marine activities; and
(d) Will not unreasonably interfere with ingress and egress of riparian owners.
The bureau shall adopt rules pertaining to this subparagraph by March 15, 1990.
In making findings pursuant to this subsection regarding a renewable ocean energy project, the director shall adopt all pertinent findings and conclusions in a permit issued for the project pursuant to chapter 206-A or pursuant to Title 38, chapter 3, subchapter 1, article 5-A or 6 or Title 38, chapter 5, subchapter 1, article 1, subarticle 1-B, as applicable, and may condition issuance of a lease for such a project on receipt of all pertinent approvals by the Department of Environmental Protection or the Maine Land Use Regulation Commission, as applicable, and other conditions the director considers reasonable.
The joint standing committee of the Legislature having jurisdiction over submerged lands matters shall review the report and submit a written recommendation regarding the bureau's proposed budget to the joint standing committee of the Legislature having jurisdiction over appropriations and financial affairs on or before March 15th of each year.
(1) The State's coastal waters and submerged lands provide unique and valuable opportunities for development of wind and tidal power and, potentially, other indigenous, renewable ocean energy resources, such as wave power;
(2) Climate change and related degradation or loss of marine resources and related human uses make development of and transition to use of renewable ocean energy resources consistent with sound stewardship of the State's public trust resources;
(3) Proper and efficient functioning of certain generation and associated facilities that use the energy potential of the State's indigenous, renewable ocean energy resources depends upon their deployment in a marine environment and, accordingly, such facilities may to the extent necessary be located in, on or over state-owned submerged lands; and
(4) With appropriate provision for avoidance and minimization of and compensation for harm to existing public trust-related uses and resources, such as fishing and navigation; consideration of potential adverse effects on existing uses of the marine environment; restoration of affected lands upon completion of authorized uses pursuant to permitting criteria; and adequate compensation to the public for use of its trust resources pursuant to state submerged lands leasing criteria, development of these renewable ocean energy resources in appropriate locations promises significant public trust-related benefits to the people of this State for whom the State holds and manages submerged lands and their resources.
(1) No more than 30 days prior to filing applications in accordance with this paragraph, an applicant for a lease or easement for a renewable ocean energy project shall participate in a joint interagency preapplication meeting that includes the Department of Marine Resources and is in accordance with permitting procedures of the Department of Environmental Protection or the Maine Land Use Regulation Commission, as applicable.
(2) An applicant for a lease or easement for a renewable ocean energy project must file and certify to the director that it has filed completed applications for requisite state permits under chapter 206-A or Title 38, chapter 3, subchapter 1, article 5-A or 6 or Title 38, chapter 5, subchapter 1, article 1, subarticle 1-B, as applicable, prior to or concurrently with submission of its submerged lands lease application under this section and shall provide a copy of any such applications to the director upon request.
(3) The director shall provide notice to the Marine Resources Advisory Council under section 6024 and any lobster management policy council established pursuant to section 6447 in whose or within 3 miles of whose designated lobster management zone created pursuant to section 6446 the proposed development is located. The Marine Resources Advisory Council and any lobster management policy council notified pursuant to this subparagraph may provide comments within a reasonable period established by the director, and the director shall consider the comments in making findings pursuant to subsection 2, paragraph A, subparagraph (6).
(4) The director may issue a lease or easement for a hydropower project, as defined in Title 38, section 632, subsection 3, that uses tidal or wave action as a source of electrical or mechanical power, for a term not to exceed 50 years, as long as the lease term is less than or equal to the term of the license for the project issued by the Federal Energy Regulatory Commission.
(5) If requested by an applicant, and with provision for public notice and comment, the director may issue one or more of the following for a renewable ocean energy project prior to issuance of a 30-year lease for the project:
(a) A lease option, for a term not to exceed 2 years, that establishes that the leaseholder, for purposes of consideration of its application for state permit approvals under chapter 206-A or Title 38, chapter 3, subchapter 1, article 5A or 6 or Title 38, chapter 5, subchapter 1, article 1, subarticle 1-B, as applicable, has title, right or interest in a specific area of state submerged lands needed to achieve the purposes of the project as described in conceptual plans in the lease application;
(b) A submerged lands lease, for a term not to exceed 3 years, that authorizes the leaseholder to undertake feasibility testing and predevelopment monitoring for ecological and human use impacts as described in conceptual plans in the lease application and conditioned on receipt of requisite federal, state and local approvals; and
(c) A submerged lands lease, for a term not to exceed 5 years, that authorizes the leaseholder to secure requisite federal, state and local approvals and complete preoperation construction, as long as the applicant provides detailed development plans describing all operational conditions and restrictions.
(6) Except as otherwise provided in this paragraph, the annual rent for a wind energy demonstration project for which a general permit has been issued under Title 38, section 480HH is $10,000 per year for the term of the general permit. The annual rent for a tidal energy demonstration project for which a general permit has been issued under Title 38, section 636A is $100 per acre of submerged lands occupied by the project for the term of the general project, except that the annual rent may not exceed $10,000. As used in this paragraph, "submerged lands occupied" includes the sum of the area on which turbines, testing and monitoring equipment, anchoring or mooring lines, submerged transmission cables or other structures are placed and any additional area from which the director finds it necessary to exclude transient public trust uses to avoid unreasonable interference with the project's purposes. An annual rent is not required for an offshore wind energy demonstration project located in the Maine Offshore Wind Energy Research Center, as designated by the department under section 1868, subsection 2.
(7) The director shall charge a lessee an annual rent in accordance with a fee schedule, established by the bureau by rule, that balances state goals of assurance of fair compensation for use and mitigation of potential adverse effects on or conflict with existing uses of state-owned submerged lands that are held in trust for the people of the State with state renewable ocean energy-related goals, including state wind energy generation goals established in Title 35-A, section 3404, subsection 2. Rules adopted pursuant to this subparagraph are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.
(8) The director may not require additional public compensation pursuant to subsection 9.
(9) The director may issue a lease for a buffer zone comprising a land or water area around permanent structures located on submerged or intertidal land if:
(a) The director determines such a buffer zone is necessary to preserve the integrity or safety of the structure or fulfill the purposes of the project; and
(b) The director consults with the Commissioner of Marine Resources regarding the need for such a buffer, its location and size and options to minimize its potential effects on existing uses.
Sec. B-2. 12 MRSA §1863, sub-§3, as repealed and replaced by PL 1999, c. 401, Pt. I, §1, is amended to read:
Sec. B-3. 12 MRSA §1863-A is enacted to read:
§ 1863-A. Renewable Ocean Energy Trust
Sec. B-4. Establishment of fee schedule for renewable ocean energy development projects. No later than one year from the effective date of this section and in accordance with the Maine Revised Statutes, Title 12, section 1862, subsection 13, paragraph B, subparagraph (6), the Department of Conservation, Bureau of Parks and Lands shall amend its submerged lands leasing rules to establish a fee schedule for leasing submerged lands for a renewable ocean energy project as defined in Title 12, section 1862, subsection 1, paragraph F-1 that balances state goals of assurance of fair compensation for use and mitigation of potential adverse effects on or conflict with existing uses of state-owned submerged lands that are held in trust for the people of the State with state renewable ocean energy-related goals, including state wind energy generation goals established in Title 35-A, section 3404, subsection 2. Rules adopted pursuant to this section are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A. Prior to adoption of such a fee schedule, the Director of the Bureau of Parks and Lands shall determine the rent on a case-by-case basis. In developing rules pursuant to this section, the bureau shall:
1. Establish fees that are commercially reasonable and comparable to pertinent lease fees in other jurisdictions both in terms of the fee amounts and provision for a graduated fee schedule that reflects consideration of energy production levels and debt service obligations in the initial years of a renewable ocean energy project;
2. Consider renewable ocean energy-related submerged lands leasing fees in other states; fees provided for by the United States Department of Interior, Minerals Management Service's Renewable Energy Program; current market practices in the wind power industry regarding lease arrangements; and other pertinent information;
3. Include in the fee schedule an amount adequate to cover the bureau's pertinent administrative costs;
4. Allow the developer of a renewable ocean energy project to enter into a contract for sale or use of project-generated power that, through reduced rates or otherwise, provides the State or electric consumers in this State a portion of the dollar value of the pertinent rental fee for use of state submerged lands and obligates the developer to provide monetary payment to the State for the remaining portion of the rental fee as provided in this Act;
5. Consult with and consider the recommendations of the Public Utilities Commission regarding provisions in the rules regarding subsection 4 and related permit terms and conditions for a lease for a renewable ocean energy project;
6. Clarify that potential adverse effects on existing uses, such as fishing, are addressed through the fee schedule and that the bureau may not require case-by-case payment of an amount in addition to rent as compensation for such project-specific effects;
7. Incorporate the annual rent and exemption established in Title 12, section 1862, subsection 13, paragraph B, subparagraph (5); and
8. Otherwise amend its rules for consistency with the provisions of this Act.
PART C
Sec. C-1. Personal property-related taxation; renewable ocean energy development. No later than November 1, 2010, the Department of Administrative and Financial Regulation, Bureau of Revenue Services shall develop and provide to the joint standing committees of the Legislature having jurisdiction over taxation matters and utilities and energy matters an analysis of whether and under what circumstances renewable ocean energy-generating machinery, equipment and related components, including but not limited to turbines, support structures, transmission cables and their component parts, that are in transit to be located in, on or above state submerged lands as defined in the Maine Revised Statutes, Title 12, section 1801, subsection 9 and that are in the State on the first day of April on the applicable tax year are exempt from taxation under Title 36, section 655, subsection 1, paragraph A, B, G or H.
PART D
Sec. D-1. 12 MRSA §682, sub-§1, as amended by PL 1999, c. 333, §1, is further amended to read:
Sec. D-2. 12 MRSA §682, sub-§19 is enacted to read:
Sec. D-3. 12 MRSA §685-B, sub-§2-C, as repealed and replaced by PL 2009, c. 492, §1, is amended to read:
Sec. D-4. 12 MRSA §685-B, sub-§4, as amended by PL 2009, c. 492, §2, is further amended to read:
The commission may not approve an application, unless:
In making a determination under this paragraph regarding an expedited wind energy development, as defined in Title 35A, section 3451, subsection 4, or a community-based offshore wind energy project, the commission shall consider the development's or project's effects on scenic character and existing uses related to scenic character in accordance with Title 35A, section 3452.
In making a determination under this paragraph regarding a wind energy development, as defined in Title 35A, section 3451, subsection 11, that is not a grid-scale wind energy development, that has a generating capacity of 100 kilowatts or greater and that is proposed for location within the expedited permitting area, the commission shall consider the development's or project's effects on scenic character and existing uses relating to scenic character in the manner provided for in Title 35A, section 3452;
The burden is upon the applicant to demonstrate by substantial evidence that the criteria for approval are satisfied, and that the public's health, safety and general welfare will be adequately protected. Except as otherwise provided in Title 35A, section 3454, the commission shall permit the applicant and other parties to provide evidence on the economic benefits of the proposal as well as the impact of the proposal on energy resources.
Sec. D-5. 12 MRSA §685-B, sub-§4-B, as enacted by PL 2007, c. 661, Pt. C, §4, is amended to read:
Sec. D-6. Maine Land Use Regulation Commission to adopt rule. No later than December 1, 2010, the Maine Land Use Regulation Commission shall adopt a rule amending its land use districts and standards to provide that offshore wind power projects, as defined in the Maine Revised Statutes, Title 38, section 480-B, subsection 6A, and community-based offshore wind energy projects, as defined in Title 12, section 682, subsection 19, are uses requiring a permit, but not a special exception, in all subdistricts. Prior to the commission's adoption of a rule in accordance with this section, an offshore wind power project or a community-based offshore wind energy project is considered a use requiring a permit, but not a special exception, in all subdistricts.
Rules adopted by the Maine Land Use Regulation Commission pursuant to this section are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.
PART E
Sec. E-1. 38 MRSA §341-D, sub-§2, as amended by PL 2007, c. 661, Pt. B, §1, is further amended to read:
The board shall assume jurisdiction over applications referred to it under section 344, subsection 2-A, when it finds that the criteria of this subsection have been met.
The board may vote to assume jurisdiction of an application if it finds that one or more of the criteria in this subsection have been met.
Any interested party may request the board to assume jurisdiction of an application.
The board may not assume jurisdiction over an application for an expedited wind energy development as defined in Title 35A, section 3451, subsection 4 or , for a certification pursuant to Title 35A, section 3456 or for a general permit pursuant to section 480HH or section 636A.
Sec. E-2. 38 MRSA §341-D, sub-§4, ¶D, as enacted by PL 2007, c. 661, Pt. B, §4, is amended to read:
Sec. E-3. 38 MRSA §344, sub-§2-A, ¶A, as amended by PL 2007, c. 661, Pt. B, §5, is further amended to read:
(1) The commissioner may not request the board to assume jurisdiction of an application for any permit or other approval required for an expedited wind energy development, as defined in Title 35A, section 3451, subsection 4, or a certification pursuant to Title 35A, section 3456 or a general permit pursuant to section 480HH or section 636A. Except as provided in subparagraph (2), the commissioner shall issue a decision on an application for an expedited wind energy development , an offshore wind power project or a hydropower project, as defined in section 632, subsection 3, that uses tidal action as a source of electrical or mechanical power within 185 days of the date on which the department accepts the application as complete pursuant to this section or within 270 days of the department's acceptance of the application if the commissioner holds a hearing on the application pursuant to section 345A, subsection 1A.
(2) The expedited review periods of 185 days and 270 days specified in subparagraph (1) do not apply to the associated facilities, as defined in Title 35A, section 3451, subsection 1, of the development if the commissioner determines that an expedited review time is unreasonable due to the size, location, potential impacts, multiple agency jurisdiction or complexity of that portion of the development. If an expedited review period does not apply, a review period specified pursuant to section 344-B applies.
The commissioner may stop the processing time with the consent of the applicant for a period of time agreeable to the commissioner and the applicant.
Sec. E-4. 38 MRSA §344-A, first ¶, as amended by PL 2009, c. 270, Pt. A, §1, is further amended to read:
The commissioner may enter into agreements with individuals, partnerships, firms and corporations outside the department, referred to throughout this section as "outside reviewers," to review applications or portions of applications submitted to the department. The commissioner has sole authority to determine the applications or portions of applications to be reviewed by outside reviewers and to determine which outside reviewer is to perform the review. When selecting an outside reviewer, all other factors being equal, the commissioner shall give preference to an outside reviewer who is a public or quasi-public entity, such as state agencies, the University of Maine System or the soil and water conservation districts. Except for an agreement for outside review regarding review of an application for a wind energy development as defined in Title 35A, section 3451, subsection 11, a certification pursuant to Title 35-A, section 3456 , an application for an offshore wind power project as defined in section 480-B, subsection 6A or a general permit pursuant to section 480-HH or section 636-A or an application for a hydropower project, as defined in section 632, subsection 3, that uses tidal action as a source of electrical or mechanical power, the commissioner may enter into an agreement with an outside reviewer only with the consent of the applicant and only if the applicant agrees in writing to pay all costs associated with the outside review.
Sec. E-5. 38 MRSA §346, sub-§4, as enacted by PL 2007, c. 661, Pt. B, §8, is amended to read:
Sec. E-6. 38 MRSA §480-B, sub-§6-A is enacted to read:
Sec. E-7. 38 MRSA §480-D, first paragraph, as amended by PL 2007, c. 353, §9, is further amended to read:
The department shall grant a permit upon proper application and upon such terms as it considers necessary to fulfill the purposes of this article. The department shall grant a permit when it finds that the applicant has demonstrated that the proposed activity meets the standards set forth in subsections 1 to 9 11, except that when an activity requires a permit only because it is located in, on or over a community public water system primary protection area the department shall issue a permit when it finds that the applicant has demonstrated that the proposed activity meets the standards set forth in subsections 2 and 5.
Sec. E-8. 38 MRSA §480-D, sub-§1, as amended by PL 2007, c. 661, Pt. B, §10, is further amended to read:
In making a determination under this subsection regarding an expedited wind energy development, as defined in Title 35A, section 3451, subsection 4, or an offshore wind power project, the department shall consider the development's or project's effects on scenic character and existing uses related to scenic character in accordance with Title 35A, section 3452. In making a decision under this subsection regarding an application for an offshore wind power project, the department may not consider whether the project meets the specific criteria designated in Title 12, section 1862, subsection 2, paragraph A, subparagraph (6), divisions (a) to (d). This limitation is not intended to restrict the department's review of related potential impacts of the project as determined by the department.
Sec. E-9. 38 MRSA §480-D, sub-§11 is enacted to read:
(1) Will meet the requirements of the noise control rules adopted by the board pursuant to article 6;
(2) Will be designed and sited to avoid unreasonable adverse shadow flicker effects; and
(3) Will be constructed with setbacks adequate to protect public safety, while maintaining existing uses to the extent practicable. In making a finding pursuant to this paragraph, the department shall consider the recommendation of a professional, licensed civil engineer as well as any applicable setback recommended by a manufacturer of the generating facilities.
Sec. E-10. 38 MRSA §480-E, sub-§1, as enacted by PL 1989, c. 656, §4 and affected by c. 890, Pt. A, §40 and amended by Pt. B, §73, is repealed and the following enacted in its place:
(1) Notice to the Maine Land Use Regulation Commission when the proposed development is located within 3 miles of an area of land within the jurisdiction of the Maine Land Use Regulation Commission; and
(2) Notice to any municipality with land located within 3 miles of the proposed development and any municipality in which development of associated facilities is proposed.
The Maine Land Use Regulation Commission and any municipality notified pursuant to this paragraph may provide comments within a reasonable period established by the commissioner and the commissioner shall consider such comments.
Sec. E-11. 38 MRSA §480-E-1, first ¶, as repealed and replaced by PL 2005, c. 330, §14, is amended to read:
The Maine Land Use Regulation Commission shall issue all permits under this article for activities that are located wholly within its jurisdiction and are not subject to review and approval by the department under any other article of this chapter , except as provided in subsection 3.
Sec. E-12. 38 MRSA §480-E-1, sub-§3 is enacted to read:
Sec. E-13. 38 MRSA §482, sub-§2, ¶D, as amended by PL 1999, c. 468, §6, is further amended to read:
Sec. E-14. 38 MRSA §482, sub-§2, ¶F, as enacted by PL 1997, c. 502, §5, is amended to read:
Sec. E-15. 38 MRSA §482, sub-§2, ¶J is enacted to read:
Sec. E-16. 38 MRSA §482, sub-§8 is enacted to read:
Sec. E-17. 38 MRSA §484, sub-§3, ¶G, as enacted by PL 2007, c. 661, Pt. B, §11, is amended to read:
Sec. E-18. 38 MRSA §484, sub-§10, as enacted by PL 2007, c. 661, Pt. B, §12, is amended to read:
The Department of Labor, the Executive Department, State Planning Office and the Public Utilities Commission shall provide review comments if requested by the primary siting authority.
For purposes of this subsection, "grid-scale wind energy development," "primary siting authority," "significant tangible benefits" and "expedited wind energy development" have the same meanings as in Title 35-A, section 3451.
Sec. E-19. 38 MRSA §488, sub-§9, as repealed and replaced by PL 2005, c. 330, §19, is amended to read:
Review by the department of subsequent modifications to a development approved by the department is required. For a development or part of a development within the jurisdiction of the Maine Land Use Regulation Commission, the director of the commission may request and obtain technical assistance and recommendations from the department. The commissioner shall respond to the requests in a timely manner. The recommendations of the department must be considered by the Maine Land Use Regulation Commission in acting upon a development application.
Sec. E-20. 38 MRSA §488, sub-§25 is enacted to read:
Sec. E-21. Rulemaking. No later than June 1, 2011, the Department of Environmental Protection shall adopt rules pursuant to the Maine Revised Statutes, Title 38, chapter 3, subchapter 1, article 5-A and Title 38, section 344, subsection 7 to provide permit by rule standards for meteorological towers in coastal wetlands that are associated with resource analysis activities in anticipation of an offshore wind power project as defined by Title 38, section 480-B, subsection 6-A. The rules must specify the class of eligible activities and may establish standards of location, design, construction or use that the department considers necessary to avoid adverse environmental impacts. These rules are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.
PART F
Sec. F-1. 12 MRSA §685-B, sub-§1-A, ¶E, as enacted by PL 2009, c. 270, Pt. D, §4, is amended to read:
Sec. F-2. 38 MRSA §634-A, sub-§1, ¶B, as enacted by PL 2009, c. 270, Pt. D, §5, is amended to read:
Sec. F-3. 38 MRSA §634-A, sub-§2, as enacted by PL 2009, c. 270, Pt. D, §5, is amended to read:
Sec. F-4. 38 MRSA §636, sub-§5, as amended by PL 2009, c. 270, Pt. D, §7, is further amended to read:
PART G
Sec. G-1. 30-A MRSA §4352, sub-§4, as amended by PL 2007, c. 656, Pt. A, §2, is further amended to read:
Sec. G-2. 30-A MRSA §4361 is enacted to read:
§ 4361. Coordination of state and municipal decision making; renewable ocean energy projects
PART H
Sec. H-1. Appropriations and allocations. The following appropriations and allocations are made.
MARINE RESOURCES, DEPARTMENT OF
Bureau of Resource Management 0027
Initiative: Establishes the Ocean Energy Fund with a base allocation.
OTHER SPECIAL REVENUE FUNDS | 2009-10 | 2010-11 |
All Other
|
$500 | $500 |
OTHER SPECIAL REVENUE FUNDS TOTAL | $500 | $500 |
Emergency clause. In view of the emergency cited in the preamble, this legislation takes effect when approved.