LD 2024
pg. 1
LD 2024 Title Page An Act to Improve the Safety Provided by the Underground Facilities Protection ... Page 2 of 2
Download Bill Text
LR 3205
Item 1

 
Emergency preamble. Whereas, Acts of the Legislature do not become
effective until 90 days after adjournment unless enacted as
emergencies; and

 
Whereas, the underground facilities protection law affects
activities that take place primarily during the building season,
which occurs during spring, summer and autumn; and

 
Whereas, enactment without emergency designation will result in
revisions becoming effective after a significant portion of the
building season is over; and

 
Whereas, the Public Utilities Commission is in receipt of a
grant to educate the public regarding the requirements of the law
and will do so most effectively if the education occurs in the
early months of the building season; and

 
Whereas, in the judgment of the Legislature, these facts create
an emergency within the meaning of the Constitution of Maine and
require the following legislation as immediately necessary for
the preservation of the public peace, health and safety; now,
therefore,

 
Be it enacted by the People of the State of Maine as follows:

 
Sec. 1. 23 MRSA §3360-A, sub-§1, ¶C, as amended by PL 1997, c. 631, §1,
is further amended to read:

 
C. "Excavation" means any operation in which earth, rock or
other material below the ground is moved or otherwise
displaced, by means of power tools, power equipment or
explosives and including grading, trenching, digging,
ditching, drilling, augering, tunneling, scraping and cable
or pipe driving, except tilling of soil and gardening or
displacement of earth, rock or other material for
agricultural purposes, and except installation and
maintenance of signs performed by the Department of
Transportation.

 
Sec. 2. 23 MRSA §3360-A, sub-§1, ¶¶D-1 and D-2 are enacted to read:

 
D-1.__"Primary locating end point" means the point at which
the underground facility emerges from the ground before the
meter or the point at which the underground facility enters
a building in which the meter is housed.

 
D-2.__"Shoulder-grading activity" means highway maintenance work
that involves the use of a motorgrader on the shoulder of a road
to remove accumulated surficial sand, gravel or