LD 1837
pg. 2
Page 1 of 4 An Act Relating to the Consideration of the Cumulative Effects on Protected Nat... Page 3 of 4
Download Bill Text
LR 2732
Item 1

 
A. An applicant for Tier 1 or, Tier 2 or Tier 3 review must
shall meet the following requirements.

 
(1) Alteration of freshwater wetland areas on the
property must be avoided to the extent feasible
considering cost, existing technology and logistics
based on the overall purpose of the project.

 
(2) The area of the freshwater wetland to be altered
must be limited to the minimum amount necessary to
complete the project.

 
(3) Erosion control measures must be used to prevent
sedimentation of protected natural resources. A 25-
foot buffer strip must be maintained between the
activity and any river, stream or brook.

 
(4) The activity must comply with applicable water
quality standards pursuant to section 480-D, subsection
5.

 
B. An applicant for Tier 1, Tier 2 or Tier 3 review for
projects that would alter wetland hydrology and could also
alter stream flows or other adjacent surface waters, must
comply with the water quality classification standards
contained in section 465.

 
C.__An applicant for Tier 1 review shall meet the following
requirements.

 
(1)__Erosion control measures must be used to prevent
sedimentation of protected natural resources.__A 25-
foot buffer strip must be maintained between the
activity and any river, stream or brook.

 
(2)__The activity must comply with applicable water
quality standards pursuant to section 480-D, subsection
5.

 
D.__An applicant for Tier 2 or Tier 3 review shall comply
with the standards contained in section 480-D.

 
Sec. 2. 38 MRSA §480-X, sub-§7, ķA, as enacted by PL 1995, c. 460, §7
and affected by §12, is amended to read:

 
A. An application form must be submitted, with the
application fee, to the department and include the following
information:


Page 1 of 4 Top of Page Page 3 of 4