(1)__Erosion control measures must be used to prevent | | sedimentation of protected natural resources.__A 25-foot | | buffer strip must be maintained between the activity and | | any river, stream or brook. |
|
| | | (2)__The activity must comply with applicable water | | quality standards pursuant to section 480-D, subsection | | 5. |
|
| | | D.__An applicant for Tier 2 or Tier 3 review shall comply | | with the standards contained in section 480-D. |
|
| | | Sec. 2. 38 MRSA §480-X, sub-§7, ķA, as enacted by PL 1995, c. 460, §7 | | and affected by §12, is amended to read: |
|
| | | A. An application form must be submitted, with the | | application fee, to the department and include the following | | information: |
|
| | | (1) Documentation that public notice has been provided | | of the proposed project in accordance with department | | rules; |
|
| | | (2) A United States Geological Survey map showing the | | project location; |
|
| | | (3) Written certification by a knowledgeable | | professional experienced in wetland science that the | | project will not alter, or cause to be altered, a | | wetland described in subsection 4 or 5; |
|
| | | (4) A top view drawing of the entire project, | | including existing and proposed fill, excavation, roads | | and structures; cross-sectional drawings of any fill or | | excavated areas; delineation of the wetland boundaries | | and calculated area of freshwater wetlands affected; | | description of existing vegetation on the project site; | | identification of any surface water bodies within 100 | | feet of the proposed alteration; and a drawing of the | | 25-foot buffer strip between the project and any river, | | stream or brook; |
|
| | | (5) A soil erosion and sedimentation control plan; |
|
| | | (6) For work in previously mined peatlands, information on the | | past mining activity, including the approximate dates of the | | mining activity, the area and depth to which peat has been | | excavated from the site, |
|
|